Outstanding Civil Engineering Achievement Award

1990    Dan Ryan Reconstruction Project
1991    Shedd Aquarium Oceanarium Addition
1992    Lake Michigan Water Supply System
1993    Side/Stream Elevated Pool Aeration Project
1994    Wheeling Township Transfer Station
1995    John F. Kennedy Rehabilitation Project
1996    Elmhurst Quarry Flood Control Facility
1997    Lake Shore Drive Improvement Project
1998    North Point Marina Submerged Reef and Revetment (Under $5 Million)
iiiiiiiiiiiiChicagoland Underflow Plan-O’Hare Reservoir (Over $5 Million)
1999    I & M Canal Bikeway: I-55 to Brandon Road (Under $5 Million)
iiiiiiiiiiiiMichigan Avenue Viaduct Reconstruction (Over $5 Million)
2000    Baker’s Lake Heronry Reconstruction (Under $5 Million)
iiiiiiiiiiiiCermak Road Rolling Lift Bridge Rehabilitation (Over $5 Million)
2001    Cook County Digital Flood Insurance Rate Maps (Under $5 Million)
iiiiiiiiiiiiChicago Inner Harbor Turning Basin (Over $5 Million)
2002    Jewel-Osco Storm Compressor System (Under $5 Million)
iiiiiiiiiiiiTransformation of Cicero Avenue at I-294 (Over $5 Million)
2003    Chicago Avenue Pumping System (Under $5 Million)
iiiiiiiiiiiiThornton Transitional Reservoir (Over $5 Million)
2004    Fredenhagen Park (Under $5 Million)
iiiiiiiiiiiiGerald Ratner Athletics Center (Over $5 Million)
2005    The Morton Arboretum Main Parking Lot (Under $5 Million)
iiiiiiiiiiiiNeutrinos at Main Injector (NuMI) Project (Over $5 Million)
2006    Reconstruction of the Main Street Bridge (Under $5 Million)
iiiiiiiiiiiiMillennium Park (Over $5 Million)
2007    Dan Ryan Skyway Interchange (Over $5 Million)
2008    Lincoln Hall Subsurface Remediation (Under $5 Million)
iiiiiiiiiiiiI-355 South Extension Veteran Memorial Highway (Over $5 Million)
2009    Spring Brook Meander Project (Under $5 Million)
iiiiiiiiiiiiCity of Evanston Combined Sewer Relief Program (Over $5 Million)
2010    I-88 and Eola Road Interchange (Over $5 Million)
iiiiiiiiiiiiWashington Park Stormwater Improvement Project (Under $5 Million)
2009    Spring Brook Meander Project (Under $5 Million)
iiiiiiiiiiiiCity of Evanston Combined Sewer Relief Program (Over $5 Million)
2010    Washington Park Stormwater Improvement Project (Under $5 Million)
iiiiiiiiiiiiI-88 and Eola Road Interchange (Over $5 Million)
2011    Rush University Medical Center Transformation Project – Harrison Tunnel (Under $5 Million)
iiiiiiiiiiiiStearns Road: An Environmental Corridor That Happens To Have a Road in It (Over $5 Million)
2012    2nd Street Stormwater Improvements – Downers Grove, IL (Under $5 Million)
2013    Big Timber Road over Pingree and Tyler Creek Project (Under $5 Million)
iiiiiiiiiiiiWacker Dr and Congress Pkwy Interchange Reconstruction Project – Chicago (Over $5 Million)
2014    Brewster Creek Headwaters Flood Control Project (Under $5 Million)
iiiiiiiiiiiiRehabilitation of Wells Street Bascule Bridge Project (Over $5 Million)
2015    Village of Niles Stormwater Relief Basins Project (Under $10 Million)
iiiiiiiiiiiiFullerton Pkwy Bridge & Pedestrian Underpass at Lincoln Park Lagoon ($10-$25 Million)
iiiiiiiiiiiiThe 606/Bloomingdale Trail, Chicago, IL (Over $25 Million)
2016    Busse Reservoir South Dam Modification Project (Under $10 Million)
iiiiiiiiiiiiNavy Pier Centennial Wheel ($10-$25 Million)
iiiiiiiiiiiiThornton Composite Reservoir MWRD (Over $25 Million)
2017    Village of Northbrook-Wescott Park Stormwater Storage Facility (Under $10 Million)
iiiiiiiiiiiiNorthwestern University Feinberg School of Medicine Simpson-Querrey Biomedical Research iiiiiiiiiiiiiiiCenter Earth Retention System ($10-$25 Million)
iiiiiiiiiiiiChicago Riverwalk (Over $25 Million)
2018    McDonald Road Bridge Replacement (Under $10 Million)
iiiiiiiiiiiiAlbany Park Stormwater Diversion Tunnel ($25-$35 Million)
iiiiiiiiiiiiWilson Station Reconstruction Project (Over $100 Million)
iiiiiiiiiiiiChicagoland Underflow Plan-McCook Reservoir (Mega Project)
2019    City of Highland Park Forest Ave over Ravine Bridge Replacement (Under $10 Million)
iiiiiiiiiiiiChicago Department of Transportation 41st Street Pedestrian Bridge ($10-$35 Million)
iiiiiiiiiiiiMorton Grove–Niles Water Commission Water Transmission Facilities Project iiiiiiiiiiiiiii($35-$100 Million)
2020    Village of Bensenville & DuPage County Stormwater Management Redmond Reservoir iiiiiiiiiiiiiiiExpansion (Under $10 Million)
iiiiiiiiiiiiVillage of Oak Park Lake St Corridor Improvement; Utility, Streetscape, and Resurfacing iiiiiii         iiiiiiii($10-$25 Million)
iiiiiiiiiiiiFox Metro Water Reclamation District CSO LTCP Phase 2 Imps. ($25-$100 Million)
2021    Ward 2 & 3 Stormwater Improvements City of Wood Dale (Under $10 Million)
iiiiiiiiiiiiLakefront Trail Pedestrian Bridge Chicago Department of Transportation ($25-$100 Million)
iiiiiiiiiiiiChicago O’Hare International Airport Runway 9C-27C Chicago Department of Aviation
iiiiiiiiiiiii  (Over $100 Million)
2022   Lincoln Yards South Environmental Remediation (Under $10 Million)
iiiiiiiiiiiIrving Park Road over the North Branch of the River Chicago Department of iiiiiii         iiiiiiiiiiiiiTransportation ($10-$25 Million)
iiiiiiiiiiiIllinois Tollway Burlington Northern Santa Fe Railway Bridge ($25-$100 Million)
iiiiiiiiiiiMidway International Airport Security Checkpoint Expansion Chicago Department of Aviation iiiiiiiiiiii   (Over $100 Million)
2023   Central Street Bridge Replacement, City of Evanston (Under $10 Million)
iiiiiiiiiiiGolf Mill Park, Village of Niles ($10-$25 Million)
iiiiiiiiiiiNeighborhood Storage Project, Village of Wilmette ($25-$100 Million)
iiiiiiiiiiiJane Byrne Interchange, Illinois Department of Transportation (Over $100 Million)